Raeisi administration plans to inaugurate 2 power plants
TEHRAN, Mar. 13 (DID) – Iran’s nuclear chief says that the construction of each power plant requires seven years and that he hopes two 1000-megawatt power plants will be inaugurated by 2029 concurrent with the end of the Raeisi administration.